{"id":4387,"date":"2023-09-05T23:29:55","date_gmt":"2023-09-05T16:29:55","guid":{"rendered":"https:\/\/vrenergy.vn\/solar-power-purchase-agreement-essential-conditions-to-ensure\/"},"modified":"2024-01-05T11:02:59","modified_gmt":"2024-01-05T04:02:59","slug":"solar-power-purchase-agreement-essential-conditions-to-ensure","status":"publish","type":"post","link":"https:\/\/vrenergy.vn\/en\/solar-power-purchase-agreement-essential-conditions-to-ensure\/","title":{"rendered":"Solar Power Purchase Agreement: Essential Conditions to Ensure"},"content":{"rendered":"<p style=\"text-align: justify;\"><span>Solar power brings high economic value to users.\u00a0With large electricity output, households can sign\u00a0<\/span><b><span>a solar power purchase contract\u00a0<\/span><\/b><span>with Vietnam Electricity Corporation EVN to reduce capital recovery time.\u00a0In the article below, we will guide you through the most complete and detailed procedures for buying and selling solar power according to current new regulations.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span id=\"Ban_dien_mat_troi_ap_mai_can_dam_bao_dieu_kien_gi\"><b><span>What conditions must be met to sell rooftop solar power?<\/span><\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><span>If you want to sign\u00a0<\/span><b><span>a solar power purchase contract\u00a0<\/span><\/b><span>with EVN, your solar power project needs to ensure the following conditions:\u00a0<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span id=\"Chat_luong_he_thong_dien_mat_troi_phai_dam_bao\"><b><span>The quality of the solar power system must be guaranteed<\/span><\/b><\/span><\/h3>\n<p style=\"text-align: justify;\"><span>In fact,\u00a0<\/span><b><span>selling solar power to EVN\u00a0<\/span><\/b><span>needs to go through many strict inspection stages.\u00a0To ensure the stability and safety of the power grid, EVN will send engineers and specialists to inspect and evaluate the quality of the solar power system.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span>Before, your project must possess all legal documents and be permitted to build by the state.\u00a0After that, experts will check technical documents, parameters of solar panels, inverter sets, manufacturer&#8217;s certificates\/certifications, quality inspection certificates of equipment, and test equipment. Testing records, technical specifications&#8230; to ensure your solar power system meets current regulations.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2805 size-large aligncenter\" title=\"Solar Power Purchase Agreement: Essential Conditions to Ensure 7\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-dien-mat-troi-la-gi-4-min-1024x538.jpg\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-dien-mat-troi-la-gi-4-min-1024x538.jpg 1024w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-dien-mat-troi-la-gi-4-min-300x158.jpg 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-dien-mat-troi-la-gi-4-min-768x403.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-dien-mat-troi-la-gi-4-min-1536x807.jpg 1536w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-dien-mat-troi-la-gi-4-min-2048x1076.jpg 2048w\" alt=\"hop dong dien mat troi la gi 4 min\" width=\"1024\" height=\"538\" \/><\/p>\n<p style=\"text-align: justify;\"><span>Next, the power company&#8217;s engineer will send someone to check the actual operating results of the system.\u00a0Only when your solar power system meets standards can the project owner sign a\u00a0<\/span><b><span>solar power purchase contract\u00a0<\/span><\/b><span>with EVN.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span>Therefore, if you plan to resell solar power to the power company, you should choose a reputable solar power solution provider to ensure project quality.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span id=\"Cong_suat_he_thong_phu_hop\"><b><span>Appropriate system capacity<\/span><\/b><\/span><\/h3>\n<p style=\"text-align: justify;\"><span>Each region will have regulations on suitable solar power system capacity to connect to the grid.\u00a0Based on the total installed capacity, your solar power system will be connected to the medium and low voltage grid to ensure the capacity of the line infrastructure is not exceeded.\u00a0Accordingly, you should research and discuss with the Electricity Company in charge of the area to get advice on appropriate capacity.\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span>Some system capacities you can refer to are:\u00a0<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><b><span>Solar power capacity under 3kWp\u00a0<\/span><\/b><span>: Connect to the low voltage grid with 1 to 3 phases depending on need.\u00a0<\/span><\/li>\n<li><b><span>Capacity equal to or greater than 3kWp\u00a0<\/span><\/b><span>: Connect to the low voltage grid with 3 phases.\u00a0<\/span><\/li>\n<li><strong><span>Capacity from 100 kWp 1 MWP or more<\/span><\/strong><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span>In cases where the capacity is too large to exceed the capacity of the electrical system in the area, the power company will issue an official dispatch informing about the overload of lines and low voltage distribution transformers.\u00a0Accordingly, agreements to reduce system capacity or upgrade lines and connect step-up transformers will be considered to be connected to the nearest medium-voltage grid.\u00a0<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span id=\"Huong_dan_dang_ky_ban_dien_mat_troi_cho_EVN\"><b><span>Instructions for registering to sell solar power to EVN\u00a0<\/span><\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><b><span>Selling solar power to EVN\u00a0<\/span><\/b><span>is not as complicated as you think, but you need to follow the prescribed procedures.\u00a0To sign\u00a0<\/span><b><span>a solar power purchase contract\u00a0<\/span><\/b><span>with EVN, you need to learn and follow the order below.<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span id=\"Dang_ky_mua_ban_dien_mat_troi_tai_dau\"><b><span>Where to register to buy and sell solar power?<\/span><\/b><\/span><\/h3>\n<p style=\"text-align: justify;\"><span>Currently, Vietnam Electricity Corporation is the only unit licensed by the state to buy and sell electricity.\u00a0EVN has authorized power companies to sign solar power purchase and sale contracts in the areas managed by the unit.\u00a0Accordingly, you only need to contact and sign a sales contract with the local power company where you live when you need to sell solar power.\u00a0<\/span><\/p>\n<h3 style=\"text-align: justify;\"><span id=\"Thu_tuc_dang_ky_ban_dien_mat_troi_cho_EVN\"><b><span>Procedures for registering to sell solar power to EVN\u00a0<\/span><\/b><\/span><\/h3>\n<p style=\"text-align: justify;\"><span>The procedures required when buying and selling solar power are as follows:\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td>\n<p style=\"text-align: center;\"><b><span>Responsibility<\/span><\/b><\/p>\n<\/td>\n<td style=\"text-align: center;\"><b><span>Job<\/span><\/b><\/td>\n<td>\n<p style=\"text-align: center;\"><b><span>Processing Time\u00a0<\/span><\/b><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center;\"><span>Investor<\/span><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span>Find out and register your need to install a solar power project.<\/span><\/td>\n<td style=\"text-align: center;\"><span>3 days before the expected project completion time.<\/span><\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center;\"><span>Electrical company\u00a0<\/span><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span>Survey and connection agreement with the investor:<\/span><\/p>\n<p><span>+ The project ensures the following conditions: Follow the next steps in the correct order in the regulations.<\/span><\/p>\n<p><span>+ Project does not meet the conditions: Agree with the investor to come up with a suitable plan for the project.\u00a0\u00a0<\/span><\/td>\n<td>\n<p style=\"text-align: center;\"><span>1 working day<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center;\"><span>Investor<\/span><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span>Implement project investment<\/span><\/td>\n<td style=\"text-align: center;\"><\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center;\"><span>Investor<\/span><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span>Submit a request to sell electricity from a solar power project.\u00a0<\/span><\/td>\n<td style=\"text-align: center;\"><\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center;\"><span>Electrical company<\/span><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span>Check project specifications:\u00a0<\/span><span>+ If you meet the requirements: Go to the next step.<\/span><\/p>\n<p><span>+ In case of unsatisfactory performance: Notify the investor to correct until the project meets the technical requirements according to regulations.\u00a0<\/span><\/td>\n<td>\n<p style=\"text-align: center;\"><span>1 working day<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td>\n<p style=\"text-align: center;\"><span>Electrical company<\/span><\/p>\n<\/td>\n<td style=\"text-align: center;\"><span>Install a 2-way electricity meter and sign\u00a0<\/span><b><span>a solar power purchase contract\u00a0<\/span><\/b><span>with the investor.<\/span><\/td>\n<td>\n<p style=\"text-align: center;\"><span>2 working days<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2 style=\"text-align: justify;\"><span id=\"Mau_hop_dong_mua_ban_dien_mat_troi_moi_nhat_2023\"><b><span>Latest solar power purchase contract form 2023<\/span><\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><b><span>The solar power purchase contract\u00a0<\/span><\/b><span>is signed between the investor and the unit authorized by EVN.\u00a0Contract content usually includes the following information:\u00a0<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u2013 National name, motto and contract name.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u2013 Based on terms and regulations.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u2013 Information of representatives of both parties (Electricity seller and electricity buyer).<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u2013 The terms and conditions stipulate the obligations, responsibilities and rights of both parties.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>\u2013 Representatives of both parties sign, clearly state their full names and stamp.<\/span><\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2815 size-full\" title=\"Solar Power Purchase Agreement: Essential Conditions to Ensure 8\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-1-min.png\" sizes=\"auto, (max-width: 797px) 100vw, 797px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-1-min.png 797w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-1-min-300x169.png 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-1-min-768x433.png 768w\" alt=\"Contract to buy mobile phone in 1 min\" width=\"797\" height=\"449\" \/><\/p>\n<blockquote><p><span>Download<\/span><span>\u00a0solar power purchase contract form:\u00a0<\/span><b><span>Here<\/span><\/b><\/p><\/blockquote>\n<h2 style=\"text-align: justify;\"><span id=\"Hinh_thuc_thanh_toan_dien_nang_luong_mat_troi\"><b><span>Payment form for solar power<\/span><\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><span>Buying electricity from EVN has become familiar to every citizen, but not everyone knows about selling electricity to this unit.\u00a0Electricity sales fees are determined by EVN for each year and calculated in VND units.\u00a0Payment method is via bank transfer and transaction fees are paid by the investor.\u00a0<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><b><span>The investor is the business that issues the invoice\u00a0<\/span><\/b><span>: Every month the invoice issued by the investor will be sent to the electricity company.\u00a0The electricity company will check and pay the electricity bill according to the above invoice.\u00a0<\/span><\/li>\n<li><b><span>The investor is a household or individual who does not issue invoices\u00a0<\/span><\/b><span>: Every month, the electricity company&#8217;s sales department is responsible for preparing electricity payment invoices on the CMIS system and submitting them to unit leaders for approval.\u00a0Finally, the invoice will be sent to the finance department to pay the investor for electricity, the payment does not include VAT.\u00a0<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span>Solar electricity payment process<\/span><\/p>\n<figure id=\"attachment_2818\" class=\"wp-caption aligncenter\" style=\"text-align: justify;\" aria-describedby=\"caption-attachment-2818\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2817 size-large\" title=\"Solar Power Purchase Agreement: Essential Conditions to Ensure 9\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-2-min-841x1024.jpg\" sizes=\"auto, (max-width: 841px) 100vw, 841px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-2-min-841x1024.jpg 841w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-2-min-246x300.jpg 246w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-2-min-768x936.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-2-min-1261x1536.jpg 1261w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-2-min-1681x2048.jpg 1681w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/05\/hop-dong-mua-ban-dien-mat-troi-2-min.jpg 1773w\" alt=\"Contract to buy mobile phone in 2 min\" width=\"841\" height=\"1024\" \/><figcaption id=\"caption-attachment-2818\" class=\"wp-caption-text\"><span>Solar power purchase and sale contract<\/span><\/figcaption><\/figure>\n<h2 style=\"text-align: justify;\"><span id=\"Cac_mo_hinh_lap_dien_nang_luong_mat_troi\"><b><span>Solar power installation models\u00a0<\/span><\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2748 size-large\" title=\"Solar Power Purchase Agreement: Essential Conditions to Ensure 10\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/04\/he-thong-dien-mat-troi-la-gi-co-nen-lap-he-thong-dien-mat-troi-hay-khong-2-min-1024x538.jpg\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/04\/he-thong-dien-mat-troi-la-gi-co-nen-lap-he-thong-dien-mat-troi-hay-khong-2-min-1024x538.jpg 1024w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/04\/he-thong-dien-mat-troi-la-gi-co-nen-lap-he-thong-dien-mat-troi-hay-khong-2-min-300x158.jpg 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/04\/he-thong-dien-mat-troi-la-gi-co-nen-lap-he-thong-dien-mat-troi-hay-khong-2-min-768x403.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/04\/he-thong-dien-mat-troi-la-gi-co-nen-lap-he-thong-dien-mat-troi-hay-khong-2-min-1536x807.jpg 1536w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/04\/he-thong-dien-mat-troi-la-gi-co-nen-lap-he-thong-dien-mat-troi-hay-khong-2-min-2048x1076.jpg 2048w\" alt=\"What is the anti-virus system? Do I need to install the anti-removal system or not? 2 min\" width=\"1024\" height=\"538\" \/><\/p>\n<p style=\"text-align: justify;\"><span>As mentioned above, not all systems can sign\u00a0<\/span><b><span>a solar power purchase contract\u00a0<\/span><\/b><span>with the power company.\u00a0You should choose the solar power installation model first if you plan\u00a0<\/span><b><span>to sell solar power to EVN\u00a0<\/span><\/b><span>.\u00a0Currently, there are three most popular installation models: grid-connected solar power and independent solar power.\u00a0<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\"><b><span>On Grid solar power system\u00a0<\/span><\/b><span>is a system connected to the national grid.\u00a0After using up all the solar power, the new equipment will use state electricity.\u00a0The system does not have storage batteries, so investment and maintenance costs are low.\u00a0Suitable for areas with stable grid infrastructure (cities, rural areas), suitable for both families and business households and businesses.<\/span><\/li>\n<li aria-level=\"1\"><b><span>An independent solar power system (Offgrid)\u00a0<\/span><\/b><span>is a system that is not connected to the national grid but operates separately.\u00a0Using storage batteries will result in higher investment costs.\u00a0Suitable for remote areas, where there is no stable power grid or houses on boats or cars.<\/span><\/li>\n<li aria-level=\"1\"><b><span>Grid-connected solar power system with storage (Hybrid)\u00a0<\/span><\/b><span>is a combination of two grid-connected and independent installation models.\u00a0The fully automatic superior features of the system can overcome the disadvantages of the above two systems.\u00a0Even if there is a power outage, you can still use electricity thanks to the stored electricity.\u00a0Installing grid-connected solar power for storage helps reduce monthly electricity costs and ensures a business model from clean power sources.\u00a0<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span>Considering the above 3 models, investors should choose to install grid-connected solar power systems with storage to enjoy many practical benefits and easily sell electricity to EVN.\u00a0<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span id=\"Nen_lua_chon_don_vi_lap_dien_mat_troi_nao\"><b><span>Which solar power installation unit should I choose?<\/span><\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><span>After understanding the process of signing\u00a0<\/span><b><span>a solar power purchase contract\u00a0<\/span><\/b><span>with EVN, you need to consider finding a qualified system installation unit.\u00a0Reputable units and brands in the market will provide quality systems and quick installation.\u00a0Comes with incentives for installation and good warranty and maintenance.\u00a0This is a commitment to quality that helps customers feel secure when investing in high-capital solar power systems.<\/span><\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2721 size-large\" title=\"Solar Power Purchase Agreement: Essential Conditions to Ensure 11\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/du-an-kien-giang-bia-nhan-thuc-thuong-hieu-min-1024x576.jpg\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/du-an-kien-giang-bia-nhan-thuc-thuong-hieu-min-1024x576.jpg 1024w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/du-an-kien-giang-bia-nhan-thuc-thuong-hieu-min-300x169.jpg 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/du-an-kien-giang-bia-nhan-thuc-thuong-hieu-min-768x432.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/du-an-kien-giang-bia-nhan-thuc-thuong-hieu-min-1536x864.jpg 1536w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/du-an-kien-giang-bia-nhan-thuc-thuong-hieu-min-2048x1152.jpg 2048w\" alt=\"An effective beer design with minimal effect\" width=\"1024\" height=\"576\" \/><\/p>\n<p style=\"text-align: justify;\"><span>Investors can evaluate based on the projects that the unit has implemented.\u00a0The more projects a unit has, the more prestigious it proves and has been trusted by many customers.\u00a0For example, VREnergy &#8211; A professional solar power system installation company<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\"><b><span>VREnergy has a systematic working process\u00a0<\/span><\/b><span>: Immediately after receiving the customer&#8217;s request, VREnergy will advise in detail on technical factors, quantity, type of equipment to use, best installation direction&#8230;\u00a0VREnergy designs 3D drawings to help customers visualize the system after installation.\u00a0Next, VREnergy will sign a contract with the customer, transport materials to the site and install properly.<\/span><\/li>\n<li aria-level=\"1\"><b><span>Attractive warranty and maintenance regime\u00a0<\/span><\/b><span>: With the motto &#8220;Optimal solutions &#8211; Operation with peace of mind&#8221;, VREnergy is always proud of its after-sales, warranty and maintenance policies that make customers satisfied.\u00a0<\/span><\/li>\n<li aria-level=\"1\"><b><span>Maximum customer support\u00a0<\/span><\/b><span>: VREnergy regularly implements discount and promotional programs.\u00a0<\/span><\/li>\n<li aria-level=\"1\"><b><span>Experience in implementing many\u00a0<\/span><a href=\"https:\/\/vrenergy.vn\/du-an\/\"><span>solar power projects<\/span><\/a><\/b><span>\u00a0: Typically Vietswan Manufacturing Factory (Binh Phuoc), LDC Processing (Binh Duong), Zylux Factory (Nghe An), Tan Phu Cuong (District 12, Ho Chi Minh City), Dau Tieng Lake 1 (Tay Ninh).<\/span><\/li>\n<\/ul>\n<p style=\"text-align: justify;\"><span>Above, we have provided detailed information about the process of signing a solar power purchase contract with EVN.\u00a0If you are an investor and need to learn details about the benefits, payback period, and profit margin when installing solar power, please immediately contact Hotline 0923797986, VREnergy&#8217;s team of experts will send you The most specific solutions and\u00a0<\/span><span>detailed\u00a0<\/span><span>plans<\/span><span>!<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Solar power brings high economic value to users.\u00a0With large electricity output, households can sign\u00a0a solar power purchase contract\u00a0with Vietnam Electricity Corporation EVN to reduce capital recovery time.\u00a0In the article below, we will guide you through the most complete and detailed procedures for buying and selling solar power according to current new regulations. What conditions must&#8230;<\/p>\n","protected":false},"author":2,"featured_media":2814,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-4387","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/posts\/4387","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/comments?post=4387"}],"version-history":[{"count":0,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/posts\/4387\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/media\/2814"}],"wp:attachment":[{"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/media?parent=4387"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/categories?post=4387"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/tags?post=4387"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}