{"id":4434,"date":"2023-07-25T10:20:39","date_gmt":"2023-07-25T03:20:39","guid":{"rendered":"https:\/\/vrenergy.vn\/solar-power-system-design-process-for-epc-contractor-projects\/"},"modified":"2024-01-05T12:24:15","modified_gmt":"2024-01-05T05:24:15","slug":"solar-power-system-design-process-for-epc-contractor-projects","status":"publish","type":"post","link":"https:\/\/vrenergy.vn\/en\/solar-power-system-design-process-for-epc-contractor-projects\/","title":{"rendered":"Solar Power System Design Process for EPC Contractor Projects"},"content":{"rendered":"<p style=\"text-align: justify;\"><span>We all have to agree that we cannot complete the\u00a0<\/span><a href=\"https:\/\/vrenergy.vn\/tong-thau-epc-dien-mat-troi\/\"><b><span>solar power EPC general contractor<\/span><\/b><\/a><span>\u00a0project without a process.\u00a0But most importantly, to determine the result, you must understand what each step takes to achieve the desired goal.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>The most important thing: creating value for businesses in implementing\u00a0<\/span><a href=\"https:\/\/vrenergy.vn\/du-an-dien-mat-troi\/\"><strong><span>solar power projects<\/span><\/strong><\/a><span>\u00a0in accordance with the business&#8217;s production &amp; application model.\u00a0And to achieve that, we need a solar power system design process for the EPC general contractor project.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>The steps to perform the process will be:<\/span><\/p>\n<ol style=\"text-align: justify;\">\n<li aria-level=\"1\"><span>Build project scope.<\/span><\/li>\n<li aria-level=\"1\"><span>Calculate the required energy needs.<\/span><\/li>\n<li aria-level=\"1\"><span>Calculate available solar energy.<\/span><\/li>\n<li aria-level=\"1\"><span>Survey the area where the solar power system will be installed.<\/span><\/li>\n<li aria-level=\"1\"><span>Determine the scale and capacity of the solar power system.<\/span><\/li>\n<li aria-level=\"1\"><span>Select the appropriate part and calculate the total cost.<\/span><\/li>\n<li aria-level=\"1\"><span>Develop detailed designs.<\/span><\/li>\n<\/ol>\n<p style=\"text-align: justify;\"><span>Let&#8217;s start learning about the process in detail!<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span id=\"Xay_dung_pham_vi_du_an\"><b><span>Build project scope<\/span><\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3531 size-large\" title=\"Solar Power System Design Process for EPC Contractor Projects 7\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-2-min-1024x538.jpg\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-2-min-1024x538.jpg 1024w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-2-min-300x158.jpg 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-2-min-768x403.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-2-min-1536x807.jpg 1536w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-2-min-2048x1076.jpg 2048w\" alt=\"The process of designing the anti-slip system for safety is complete in EPC 2 min\" width=\"1024\" height=\"538\" \/><\/p>\n<p style=\"text-align: justify;\"><span>The project scope is the map that defines everything that will be done in the EPC General Contractor Project.\u00a0To ensure that the project is carried out effectively and meets its objectives, defining the project scope is an important first step.<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\"><b><span>The project&#8217;s goals\u00a0<\/span><\/b><span>must be set clearly and specifically.\u00a0This could include providing clean and sustainable power to industrial infrastructure, minimizing energy bills, or even participating in a greenhouse gas program.\u00a0Objectives define the direction for the entire design and implementation process.<\/span><\/li>\n<li aria-level=\"1\"><b><span>Technical requirements\u00a0<\/span><\/b><span>are specific technical specifications that the solar power system must meet.\u00a0This can be related to the capacity, performance, efficiency, and reliability of the system.\u00a0Clearly defining technical requirements helps ensure that the system will function in the expected way.<\/span><\/li>\n<li aria-level=\"1\"><b><span>Future scalability\u00a0<\/span><\/b><span>is an important factor to ensure project sustainability and flexibility.\u00a0This includes anticipating the possibility of adding capacity or expanding the system in the future as demand increases.\u00a0Integrating scalability into the initial design helps avoid having to re-implement the entire system later.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span id=\"Tinh_toan_nhu_cau_nang_luong\"><strong><span>Calculate energy needs<\/span><\/strong><\/span><\/h2>\n<p style=\"text-align: justify;\"><span>This step is one of the important steps in the solar power system design process, where we determine the amount of energy that needs to be produced by the system to meet the current and future electricity needs of the project. .<\/span><\/p>\n<p style=\"text-align: justify;\"><span>To start, we need to collect data on the project&#8217;s recent daily, monthly or annual electricity consumption.\u00a0Through this data, we have a clear view of the amount of electricity the project is using and the frequency of consumption.<\/span><\/p>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3533 size-large\" title=\"Solar Power System Design Process for EPC Contractor Projects 8\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-3-min-1024x538.jpg\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-3-min-1024x538.jpg 1024w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-3-min-300x158.jpg 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-3-min-768x403.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-3-min-1536x807.jpg 1536w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-3-min-2048x1076.jpg 2048w\" alt=\"The process of designing a solar power system for electrical safety is epc 3 min\" width=\"1024\" height=\"538\" \/><\/p>\n<p style=\"text-align: justify;\"><span>Based on current consumption data and factors such as population growth, activity expansion, and changing electricity usage habits, we can predict future electricity consumption growth.\u00a0This helps us ensure that the designed solar power system can meet the growing needs of the project.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>By\u00a0<\/span><a href=\"https:\/\/vrenergy.vn\/cach-tinh-toan-san-luong-dien\/\"><strong><span>calculating the amount of electricity<\/span><\/strong><\/a><span>\u00a0consumed by the project in a specific period of time (like a year), we can determine the amount of energy needed to be produced by the solar power system.\u00a0By comparing energy demand with available solar energy at the project site, we have a view of the ability to meet demand with solar energy.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span id=\"Tinh_toan_nang_luong_mat_troi_kha_dung\"><strong><span>Calculate available solar energy<\/span><\/strong><\/span><\/h2>\n<p style=\"text-align: justify;\"><span>This step is an important part of ensuring that the solar power system is designed based on the available solar energy at the project&#8217;s specific location.\u00a0This calculation requires considering many factors such as geographical location, tilt angle, solar panel orientation and weather conditions to estimate the ability to receive solar energy accurately.<\/span><\/p>\n<p style=\"text-align: justify;\"><b><span>The exact geographical location\u00a0<\/span><\/b><span>of the project is determined through GPS coordinates.\u00a0This allows us to use geolocation data to calculate the available solar energy at this particular location.<\/span><\/p>\n<p style=\"text-align: justify;\"><span>Based on geographical location, we calculate the amount of solar energy received at that location.\u00a0This calculation process is based on parameters such as the solar energy source at the exposed sun (solar constant) and factors such as the tilt angle and orientation of the solar panels.<\/span><\/p>\n<p style=\"text-align: justify;\"><b><span>The tilt angle\u00a0<\/span><\/b><span>and\u00a0<\/span><b><span>orientation of solar cell arrays\u00a0<\/span><\/b><span>have a significant influence on energy collection efficiency.\u00a0Setting the angle to optimize sunlight reception and orienting the panels to direct light onto them enhances energy collection efficiency.<\/span><\/p>\n<p style=\"text-align: justify;\"><b><span>Weather factors\u00a0<\/span><\/b><span>such as clouds, air conditions, and day and night also affect the amount of solar energy available.\u00a0This requires looking at the average weather during the project period to estimate solar gain.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span id=\"Khao_sat_khu_vuc_lap_dat_he_thong_dien_mat_troi\"><a href=\"https:\/\/vrenergy.vn\/khao-sat-khu-vuc-lap-dat-he-thong-dien-mat-troi\/\"><strong><span>Survey the area where the solar power system will be installed<\/span><\/strong><\/a><\/span><\/h2>\n<p style=\"text-align: justify;\"><span>When it comes to this step, performing a technical survey at the installation site will ensure that the solar power system will be deployed optimally.\u00a0Here is a short description of the process:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li aria-level=\"1\"><b><span>Conduct site survey:\u00a0<\/span><\/b><span>First, experts will conduct a direct survey at the project location to determine important factors.\u00a0This includes determining the proposed installation location and considering opportunities to optimize this location to make the most of sunlight.<\/span><\/li>\n<li aria-level=\"1\"><b><span>Occlusion:\u00a0<\/span><\/b><span>The surveyor will identify factors that may obscure the solar panels such as trees, building structures or other objects.\u00a0This helps ensure that the battery panel will be placed in an unobstructed location, thereby optimizing energy collection.<\/span><\/li>\n<li aria-level=\"1\"><\/li>\n<li aria-level=\"1\"><b><span>Light direction:\u00a0<\/span><\/b><span>The expert will determine the best direction for the solar panels to direct light onto them.\u00a0This requires considering the angle and orientation of the panels to ensure that they receive sunlight effectively.<\/span><\/li>\n<li aria-level=\"1\"><b><span>Safety in installation:\u00a0<\/span><\/b><span>During installation, safety is the top priority.\u00a0The surveyor will consider safety factors such as support structures, secure access and protective measures during installation.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span id=\"Xac_dinh_quy_mo_va_cong_suat_he_thong\"><strong><span>Determine system size and capacity<\/span><\/strong><\/span><\/h2>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3290 size-large\" title=\"Solar Power System Design Process for EPC Contractor Projects 9\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/lap-dien-mat-troi-co-can-xin-phep-hay-khong-1-min-1024x538.jpg\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/lap-dien-mat-troi-co-can-xin-phep-hay-khong-1-min-1024x538.jpg 1024w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/lap-dien-mat-troi-co-can-xin-phep-hay-khong-1-min-300x158.jpg 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/lap-dien-mat-troi-co-can-xin-phep-hay-khong-1-min-768x403.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/lap-dien-mat-troi-co-can-xin-phep-hay-khong-1-min-1536x807.jpg 1536w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/lap-dien-mat-troi-co-can-xin-phep-hay-khong-1-min-2048x1076.jpg 2048w\" alt=\"Do I need permission to set up my phone? 1 min\" width=\"1024\" height=\"538\" \/><\/p>\n<p style=\"text-align: justify;\"><span>This step is an important decision process to ensure that the solar power system will properly meet the energy needs of the project.\u00a0Below is a short description of this process:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><strong><span>Based on energy demand and ability to receive solar energy:<\/span><\/strong><span>\u00a0We will synthesize information from calculating energy demand (Step 2) and calculating available solar energy (Step 3).\u00a0This process helps us determine how much energy needs to be produced to meet project needs.<\/span><\/li>\n<li><strong><span>Calculate the required number of panels:<\/span><\/strong><span>\u00a0Based on the amount of energy needed to produce and the performance of the solar panels, we calculate the number of panels needed.\u00a0This includes reviewing battery panel performance based on site conditions and calculating how they will collect solar energy.<\/span><\/li>\n<li><strong><span>Determine the power needed to provide<\/span><\/strong><span>\u00a0: Based on the number of battery panels needed, we calculate the power needed to be provided by the system.\u00a0This capacity is usually measured in kW or MW and represents the system&#8217;s ability to produce electricity over a specific period of time.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span id=\"Lua_chon_bo_phan_phu_hop_va_tinh_toan_phi_dau_tu\"><strong><span>Select the appropriate department and calculate the investment fee<\/span><\/strong><\/span><\/h2>\n<p style=\"text-align: justify;\"><span>In this step, the process of selecting components and calculating the total cost of the solar power system is done carefully to ensure that the system will operate efficiently and bring the best value.\u00a0Below is a short description of this process:<\/span><\/p>\n<ul style=\"text-align: justify;\">\n<li><strong><span>Choosing the right parts:<\/span><\/strong><span>\u00a0Based on technical requirements and information about energy needs, we will choose parts such as battery panels, inverters and energy storage systems.\u00a0This selection is based on performance, reliability and compatibility of components with each other.<\/span><\/li>\n<li><strong><span>Determine performance and value:<\/span><\/strong><span>\u00a0Each department has different performance and value.\u00a0Efficiency determination helps ensure that the system will operate consistently and achieve the expected level of energy production.\u00a0At the same time, consider the value of each component to ensure that they provide the best bang for the buck in terms of performance and price.<\/span><\/li>\n<li><strong><span>Calculate the total cost of the system:<\/span><\/strong><span>\u00a0This process includes calculating the total cost of the solar power system.\u00a0Total cost includes both parts procurement and installation costs.\u00a0This calculation helps determine the financial costs required to deploy the system.<\/span><\/li>\n<\/ul>\n<h2 style=\"text-align: justify;\"><span id=\"Xay_dung_ban_thiet_ke_chi_tiet\"><b><span>Develop detailed designs<\/span><\/b><\/span><\/h2>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-3529 size-large\" title=\"Solar Power System Design Process for EPC Contractor Projects 10\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-1-min-1024x538.jpg\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-1-min-1024x538.jpg 1024w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-1-min-300x158.jpg 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-1-min-768x403.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-1-min-1536x807.jpg 1536w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/08\/quy-trinh-thiet-ke-he-thong-dien-mat-troi-cho-du-an-tong-thau-epc-1-min-2048x1076.jpg 2048w\" alt=\"The process of designing a solar power system for safety is epc 1 min\" width=\"1024\" height=\"538\" \/><\/p>\n<p style=\"text-align: justify;\"><span>The final step in the solar power system design process is to create a detailed design.\u00a0This process helps ensure that the system will be implemented correctly and meets all technical requirements and complies with regulations and standards.\u00a0Below is a detailed description of this process:<\/span><\/p>\n<p style=\"text-align: justify;\"><strong><span>Create detailed technical drawings:<\/span><\/strong><span>\u00a0In this step, we will create detailed technical drawings to determine the specific locations of solar panels, power lines and inverter systems.\u00a0This drawing will show the exact location of each panel on the roof or other mounting surface, as well as the electrical lines connecting them.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong><span>Compliance with technical regulations and standards:<\/span><\/strong><span>\u00a0During the process of developing detailed designs, we must ensure that the design complies with all technical regulations and standards related to the implementation of the electrical system. sun.\u00a0This includes regulations regarding safety, performance and installation techniques.<\/span><\/p>\n<p style=\"text-align: justify;\"><strong><span>Ensuring stable operation over a long period of time:<\/span><\/strong><span>\u00a0The detailed design needs to ensure that the system will operate stably over a long period of time.\u00a0This requires ensuring that components are placed properly, electrical lines are connected correctly and that factors such as wind, rain and temperature do not affect the system&#8217;s operation.<\/span><\/p>\n<h2 style=\"text-align: justify;\"><span id=\"VREnergy_Don_vi_trien_khai_du_an_tong_thau_dien_mat_troi_chuyen_nghiep\"><strong><span>VREnergy &#8211; Professional solar power general contractor project implementation unit<\/span><\/strong><\/span><\/h2>\n<p style=\"text-align: justify;\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2717 size-large\" title=\"Solar Power System Design Process for EPC Contractor Projects 11\" src=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/nhan-su-thi-cong-nhan-thuc-thuong-hieu-min-1024x720.jpg\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" srcset=\"https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/nhan-su-thi-cong-nhan-thuc-thuong-hieu-min-1024x720.jpg 1024w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/nhan-su-thi-cong-nhan-thuc-thuong-hieu-min-300x211.jpg 300w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/nhan-su-thi-cong-nhan-thuc-thuong-hieu-min-768x540.jpg 768w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/nhan-su-thi-cong-nhan-thuc-thuong-hieu-min-1536x1080.jpg 1536w, https:\/\/vrenergy.vn\/wp-content\/uploads\/2023\/02\/nhan-su-thi-cong-nhan-thuc-thuong-hieu-min-2048x1440.jpg 2048w\" alt=\"Recognition of minimally effective recognition\" width=\"1024\" height=\"720\" \/><\/p>\n<p style=\"text-align: justify;\"><span>VREnergy is a professional unit in the field of implementing solar power general contractor projects, committed to providing sustainable and effective energy solutions for large and small scale projects.\u00a0With specialized focus and expertise, VREnergy has built a trusted name in the design, installation and operation of solar power systems.<\/span><\/p>\n<ol style=\"text-align: justify;\">\n<li><strong><span>Quality and Performance:<\/span><\/strong><span>\u00a0With a focus on quality and performance, VREnergy ensures that each solar power project is implemented according to the highest standard processes.\u00a0From top-of-the-line component selection to detailed blueprint construction, every aspect is carried out with care and strict quality checks.<\/span><\/li>\n<li><strong><span>Engineering and Innovation:<\/span><\/strong><span>\u00a0VREnergy has a team of experienced and passionate technical experts about solar energy.\u00a0This allows them to apply the most advanced technical and innovative solutions in each phase of the project.\u00a0The combination of extensive knowledge and innovative spirit helps VREnergy create optimal and efficient solar energy systems.<\/span><\/li>\n<li><strong><span>Cost Optimization and Financial Efficiency:<\/span><\/strong><span>\u00a0An important part of solar power project implementation is optimizing costs and ensuring financial efficiency.\u00a0VREnergy does this through careful selection of components, meticulous total cost calculations and ensuring that the system is designed to deliver the most value to the customer.<\/span><\/li>\n<li><strong><span>Committed to sustainability:<\/span><\/strong><span>\u00a0VREnergy understands the importance of sustainable energy in today&#8217;s world.\u00a0They are committed to contributing to building a greener and cleaner future through the implementation of efficient and sustainable solar power projects.<\/span><\/li>\n<li><strong><span>Professional service:<\/span><\/strong><span>\u00a0Professionalism and dedication in service are an indispensable part of VREnergy.\u00a0They advise, support and interact closely with customers throughout the project implementation process, ensuring that all requirements and expectations are fully met.<\/span><\/li>\n<\/ol>\n<p style=\"text-align: justify;\"><span>With a combination of expertise, innovative techniques and commitment to sustainability, VREnergy has built a solid reputation in the field of solar power project implementation.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>We all have to agree that we cannot complete the\u00a0solar power EPC general contractor\u00a0project without a process.\u00a0But most importantly, to determine the result, you must understand what each step takes to achieve the desired goal. The most important thing: creating value for businesses in implementing\u00a0solar power projects\u00a0in accordance with the business&#8217;s production &amp; application model.\u00a0And&#8230;<\/p>\n","protected":false},"author":2,"featured_media":3530,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[],"class_list":["post-4434","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"_links":{"self":[{"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/posts\/4434","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/comments?post=4434"}],"version-history":[{"count":0,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/posts\/4434\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/media\/3530"}],"wp:attachment":[{"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/media?parent=4434"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/categories?post=4434"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vrenergy.vn\/en\/wp-json\/wp\/v2\/tags?post=4434"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}