Location
Bau Bang Industrial Park, Bau Bang District, Binh Duong Province
Completion time
2023
Wattage
1465 kWp

Project overview:

Emivest Feedmilll Solar Power EPC General Contractor Project

  • Aim: save energy
  • Installation location: parking lot at the factory
  • Power battery used: JA 450W
  • Conversion inverter: Huawei

One of the things VREnergy is most excited about is our highly professional and skilled team. We know how to flexibly use empty roof space to produce clean energy electricity to serve factory production and upgrade. Enhance the “green” image of your business.

Take advantage of the empty roof of the factory parking lot to install 3,256 JA 450W energy panels .

VREnergy is very confident and honored to provide solar power solutions with a FULL PACKAGE OF CONSULTATION – DESIGN – CONSTRUCTION – MAINTENANCE. Each project construction phase is specifically planned and implemented by a team of professionals, down to the smallest detail.

 du an Emivest

 du an Emivest

 du an Emivest

 du an Emivest

 du an Emivest

 du an Emivest

 

 

Connect with VR Energy's Advisory Team

We are ready to send you the most comprehensive solar power system construction plan!

    Other Projects